Missing the out tubes, obviously, I have to get some 1 1/2" 90's.
Found some connections, so now have 1" pipe minimum coming out of the Mag pump.
Got 1 1/2" couplers for both top and bottom, so it can be easily removed for the hopefully never needed cleaning. I'll right angle into the top, and have a spot there to be able to plumb in a co2 line down the road along with a ball valve.
90 out from the bottom, ball valve, then the MAG pump.
This is still all 3" pipe size, so that is a good amount of water volume in that little diamond - and I can make the pipe "legs" longer if I want, just used the couplers from the first setup to get an idea of how it'd work.
Thoughts?
Second version - dual chamber CO2 reactor
- Ghazanfar Ghori
- Site Admin
- Posts: 3258
- Joined: Sun Nov 23, 2003 5:26 am
- Location: United States